Choose the question before the sample.
A material reference, structural sample and printed sample answer different questions. Ask whether the sample represents your final components and processes; agree any substitutions before paying or approving it.
Material reference
Compare named paper or holder contact surfaces for color, texture and appearance. A flat swatch cannot confirm assembled fit.
Discuss a material referenceStructural sample
Review the opening, internal holder, jewelry placement, closure and removal with the identified item. It may use substitute finishes.
Discuss a structural samplePrinted sample
Review artwork position, color and logo finish on the agreed material. Confirm which processes match the proposed production version.
Discuss a printed samplePut the scope in writing.
- Identify the box, holder, jewelry and artwork revision.
- List included and excluded parts, materials and logo processes.
- Agree the number of samples, fees, shipping and any credited charges.
- Confirm revision rounds, timing and the event that starts the clock.
- Name the person who reviews the sample and the required decisions.
Fees, delivery and timing are project-specific; a sample request is not an order or approval.
Record what you actually see.
Photograph the identified sample closed, open and with the jewelry installed. Record the sample version and date, then check loading, contact points, lid clearance and complete removal. For print, compare the approved artwork, position and finish under consistent lighting.
Write observations separately from requested changes. Agree how revisions will be reviewed and which specification will be used before production. A sample inspection does not by itself prove shipping performance, contact safety or long-term storage results.